1.
|
PRE-CONSTRUCTION
MEETING:
|
|
|
|
|
|
|
|
Prior
to commencement of construction, the pad contractor is required to
meet with the McCarthy Building Co. Site Superintendent to review
project policies and procedures, and to establish a staging area agreement.
The following documents must be furnished prior to mobilizing on-site:
|
|
|
|
a)
|
Submit
a Certificate of Insurance to Vestar Development Company with a copy
to McCarthy Building Co. naming the following entities as additionally
insured:
|
|
|
|
|
i) Vestar Arizona XXXIII,
L.L.C.
|
|
|
|
|
ii) Bank of America, NA
|
|
|
|
|
iii) Layton Construction Co.
|
|
|
|
b)
|
Provide
a 24-hour contact list, which should include all Subcontractors onsite.
|
|
|
|
c)
|
Provide
a copy of pad contractor's State of Arizona general contractor's license.
|
|
|
|
d)
|
Provide
an 8 1/2" x 11" Staging Area Plan approved by
McCarthy Building Co. as indicated by a McCarthy Building Co. representative
signature on said plan. |
|
|
|
|
|
|
|
|
Construction
may not commence without the pad contractor having an executed letter
of intent or construction contract with Vestar Development Company.
|
|
|
|
|
|
|
|
2.
|
COORDINATION
AND COOPERATION:
|
|
|
|
|
|
|
|
|
The
pad contractor shall not interfere or impede site or surrounding building
work. In the event pad contractor willfully violates requirements
of these Rules and Regulations, McCarthy Building Co. may order the
pad contractor to remove its equipment and its employees from the
Project Site.
|
|
|
|
|
|
|
|
3.
|
JOB
CONDUCT GUIDELINES:
|
|
|
|
|
|
|
|
|
Workers
shall be confined to approved staging areas and are required to maintain
good discipline. Violation of the Job Conduct Guidelines or
violation of Basic Safety Rules and Regulations as required by O.S.H.A.
and entitles McCarthy Building Co. to cause violating individual and/or
pad contractor to being removed from the site. Any injury or
accident must be immediately reported, in writing, to McCarthy Building
Co.'s Project Manager or Site Superintendent.
|
|
|
|
|
|
|
|
|
a)
|
Head
Protection |
|
|
|
|
 |
Hard
hats must be worn at all times. NO EXCEPTIONS.
|
|
|
|
|
b)
|
First
Aid |
|
|
|
|
 |
Every
pad contractor is expected to provide adequate first aid and
safety kits to care for any injury of their employees. |
|
|
|
|
c)
|
Fire
Control |
|
|
|
|
 |
No
open fires, fire barrels or hot boxes. |
|
|
|
|
|
 |
Fire
extinguishers are required in: |
|
|
|
|
|
|
Trailer/office
‚ minimum 10 lb. ABC
|
|
|
|
|
|
Equipment
‚ minimum 5 lb. ABC
|
|
|
|
|
|
Fire
Watch ‚ minimum 20 lb. ABC
|
|
|
|
|
 |
Extinguishers
must be on lifts and scaffold, not on the floor. |
|
|
|
|
|
 |
Combustible
materials storage is not permitted on site. |
|
|
|
|
|
 |
Construction
trash may not accumulate. The grounds and parking area
are to be kept clean at all times. |
|
|
|
|
d)
|
Foot
Protection |
|
|
|
|
 |
Work
boots are required. Loafers, tennis shoes, or soft soled
shoes are not allowed. |
|
|
|
|
e)
|
Ladders |
|
|
|
|
 |
No
metal ladders are allowed on site. Damaged ladders must
be immediately removed from this project. |
|
|
|
|
f)
|
Scaffolding |
|
|
|
|
 |
Full
handrails, mid-rails, toeboards, full decking are required on
all scaffolding regardless of height. Access ladders must
either be built in or attached. |
|
|
|
|
g)
|
Work
Clothing |
|
|
|
|
 |
All
shirts must have a minimum of four (4)-inch sleeve length over
shoulders and must be worn at all times. No shorts, cut-offs,
tank tops, etc. |
|
|
|
|
h)
|
Electrical |
|
|
|
|
 |
GFI
protection is required on all electrical systems. |
|
|
|
|
I)
|
Signage |
|
|
|
|
 |
Signage
must be posted for public safety and/or general warning.
|
|
|
|
|
|
 |
All
marketing signage must be submitted to Vestar Development Company
for approval. Send all requests in writing to Robert Kerwin,
Vestar Development Company, 2425 E. Camelback Road, Suite 750,
Phoenix, Arizona 85016 |
|
|
|
|
|
|
|
|
|
|
*Under
NO circumstances will penetrations to the EFIS be permitted!
EFIS, once damaged, is impossible to patch precisely due to on site
color mixing. Thus, any penetrations done to the EFIS will result
in serious consequences to the Tenant as well as a forever blemished
storefront facade.
|
|
|
|
|
|
|
|
|
Safety
issues include, but are not limited to, the above guidelines.
|
|
|
|
|
|
|
|
4.
|
PAD
CONTRACTOR'S OFFICES AND BUILDINGS:
|
|
|
|
|
|
|
|
|
Arrangements
for the location of the pad contractor's staging area, project office
trailer, sheds, roll-off dumpster, waste containers, portable toilets,
etc. shall be made with the Site Superintendent during your pre-construction
meeting. All staging areas must be secured with 6' high chain-link
fencing. NO EXCEPTIONS! You may be asked to relocate your
field operations during the course of construction. This relocation
must be completed within ten (10) days of notification by McCarthy
Building Co. All costs associated with a move are the pad contractor's
responsibility.
|
|
|
|
|
|
|
|
5.
|
PROJECT
WORK HOURS:
|
|
|
|
|
|
|
|
|
This
site is accessible from 5:00am to 5:00pm seven (7) days per week.
Any variations to these hours will be posted by McCarthy Building
Co. Special consideration will be given for off-hour access
on an individual, as needed, basis.
|
|
|
|
|
|
|
|
6.
|
JOB
SITE STORAGE:
|
|
|
|
|
|
|
|
|
It
will be determined during your pre-construction meeting with the Project
Manager or Site Superintendent if a staging area for materials, tools
and equipment is available on site. Job site storage is limited
and it may be necessary to arrange for off site storage. If
a site location is available, it will be on a temporary basis only.
You may be asked to relocated to accommodate base building and/or
site work.
|
|
|
|
|
|
|
|
|
Any
damage or losses resulting from storage of materials, tools and equipment
shall be remedied at the cost of the pad contractor. The pad
contractor is responsible for erection, dismantling, maintenance,
utilities, fencing, telephone, security, etc. that it deems necessary
in setting up its offices, sheds and storage areas.
|
|
|
|
|
|
|
|
|
Materials
and Equipment temporarily stored at the Premises shall be located
so as not to interfere with the work of any other pad contractor or
McCarthy Building Co.'s subcontractors. Storage areas are to
be maintained in a clean, orderly manner and to McCarthy Building
Co.'s satisfaction.
|
|
|
|
|
|
|
|
7.
|
DRINKING
WATER:
|
|
|
|
|
|
|
|
|
Each
pad contractor is to provide ice and portable water at the job site
for use by pad contractor's field workmen.
|
|
|
|
|
|
|
|
8.
|
TEMPORARY
TELEPHONE:
|
|
|
|
|
|
|
|
|
Each
pad contractor is responsible for providing a required telephone service
for performing the work under his or her respective contract.
|
|
|
|
|
|
|
|
9.
|
TEMPORARY
POWER AND LIGHTING:
|
|
|
|
|
|
|
|
|
Each
pad contractor is responsible for providing temporary power as required
for its job completion. The Site Superintendent will advise
of availability and location.
|
|
|
|
|
|
|
|
10.
|
MISCELLANEOUS
TEMPORARY FACILITIES:
|
|
|
|
|
|
|
|
|
Each
pad contractor, at his own expense, shall provide any other temporary
facilities and/or requirements the trade contractors believe to be
required by his work.
|
|
|
|
|
|
|
|
11.
|
TRAFFIC
CONTROL:
|
|
|
|
|
|
|
|
|
The
pad contractor is responsible for any traffic control and barricades
necessary to perform their work. The project speed limit is
10 mph.
|
|
|
|
|
|
|
|
12.
|
ACCESS
AND MATERIAL DELIVERY:
|
|
|
|
|
|
|
|
|
An
access route to your space will be through a site gate location to
be selected by McCarthy Building Co. All construction personnel
and deliveries are required to use this entry. It is the responsibility
of the pad contractor to ensure that all personnel and vendors making
deliveries to the job site are aware of the job site location and
access route. McCarthy Building Co. will not direct or accept
your deliveries. You will be notified should project conditions
necessitate an access route change.
|
|
|
|
|
|
|
|
|
Deliveries
to the site shall be controlled so that materials are not stored for
excessive periods before erection and incorporation into the structure
or structures.
|
|
|
|
|
|
|
|
13.
|
PARKING:
|
|
|
|
|
|
|
|
|
Pad
contractors and their employees are restricted to the staging areas
designated by the Lease Exhibit (or in the absence of a Lease Exhibit,
by McCarthy Building Co.) and are subject to change. Construction
vehicles parked other than in designated areas may be subject to towing
without prior notification. Towing and retrieving costs are
at the vehicle owner's expense.
|
|
|
|
|
|
|
|
|
Parking
in driveways, fire lanes and established loading zones is strictly
prohibited. Delivery vehicles must be completely unloaded at
curbside and then moved out. Unattended vehicles in loading
zones will be tagged or towed at the vehicle owner's expense.
|
|
|
|
|
|
|
|
14.
|
PROTECTION
OF EXISTING UTILITIES:
|
|
|
|
|
|
|
|
|
The
pad contractor is responsible for verifying the exact location of
all existing utilities. The contractor shall protect utilities
left in service including construction temporary power and telephone
lines at all times. Any damage to utility lines caused by the
pad contractor operations shall be reported promptly to the owning
utility company. The utility company shall make repairs at the
pad contractor's expense.
|
|
|
|
|
|
|
|
15.
|
MISCELLANEOUS
PROTECTION:
|
|
|
|
|
|
|
|
|
The
pad contractors are responsible for protecting property, personnel
and the work of other pad contractors in carrying out their work.
The pad contractor is responsible for all cost of patching, repairs
and replacement for work damaged by their work forces. The pad
contractor shall take all reasonable precautions to protect their
work from damage by other pad contractors including providing and
maintaining protection and barricading of their work area. This
includes, but is not limited to, any open trenches, pits and shafts,
holes in floor or walls, and similar potentially hazardous areas.
All pad contractors shall fence their respective work and staging
area.
|
|
|
|
|
|
|
|
16.
|
CLEAN-UP/TRASH:
|
|
|
|
|
|
|
|
|
Clean
up shall include removal and legal disposal of all debris from the
site. The pad contractor shall remove empty carton, crates and
other combustible refuse from the premises daily. Dirt or rubbish
is not allowed to accumulate so it becomes detrimental to employees
or to the work of the various trades. If a dispute should arise
between the pad contractors and separate contractors as to their responsibility
for cleaning up the project site, McCarthy Building Co. may clean
up the site and charge the cost against the contract amount of the
pad contractors responsible as McCarthy Building Co. determines to
be just.
|
|
|
|
|
|
|
|
17.
|
SECURITY:
|
|
|
|
|
|
|
|
|
The
pad contractor is responsible for all temporary security or facilities
the pad contractor believes is required.
|
|
|
|
|
|
|
|
18.
|
HELICOPTER
LIFTS:
|
|
|
|